An elite football training facility, built in real time.

Scroll to build
On scheduleLive
25%
Built to date
645
Days on site
66%
Budget drawn

Completion

25% in.
Still rising.

Today
As built · 25%Projected · 100%

Everything past the marker is the projected finish — the build film shows the vision, not what stands today.

Build log

03 milestones
Level 3 slab pour
Aug 16
Signed off · QA cleared
East wing façade install
Live
Live · 3 crews on deck
Central atrium steelwork
Staging
Staging · steel delivered
East wing façade install 45% Lift core pour — block C 45% East wing glazing line 88% Roof truss lift — bay 4 66% East wing façade seal 48%

The squad

Engineering
Braxley Nevim 01
Braxley Nevim
Lead Engineer
braxleynevimllc.com
02Liam CroftStructural
03Aisha KhanArchitecture

The facility

Built to
perform.

Location undisclosed

+1-305-555-0100

Site office · by appointment
Azestian© 2026 · Azestian Training Facility